  • South Pars Phases 17&18 – SPD25 & SPD26

     Client  Oil & Gas Company (POGC) & IDRO/ Iran Marine Industrial Co. (SADRA)
     Location  South Pars Gas Field, Persian Gulf
     Project Start Date  2009
     Scope of Work  Detail Design, Procurement Engineering with collaboration with consultant
     Collaborator SAHEL Engineering Co
     Brief Description
    SPD25 & SPD26 of the South Pars Gas Field Development Phases 17&18 consists of Two identical wellhead platforms which will be used to separate associated water from the gas.
         ▪ Well Head Platform SPD25: 4700 Ton
         ▪ Well Head Platform SPD26: 4700 Ton
         ▪ Two Relief Platform: 2×1100 Ton
         ▪ Two Bridges: 2×238 Ton
         ▪ Infield Pipelines: 20” with 4” Piggy Back Line: 20.6 Km
         ▪ Infield Pipelines: 18” with 4” Piggy Back Line: 8.5 Km