Pire co
Pire co
Pire co
  • South Pars Phase 8 Pipeline

     Client: Pars Oil & Gas Company (POGC)/ PETROPARS & STATOIL (Norway)/ Iran Marine Industrial Co. (SADRA)
     Location: South Pars Gas Field. Approximately 100 km south of the Assaluyeh port in the Persian Gulf, Iranian offshore sector
     Scope of Work: Detail Design, Procurement Engineering
     Brief Description:
    The objective of South Pars Phase 8 Pipeline is transportation of wet gas from phase 8 platform of South Pars gas field in 3-Phase mode to shore via a 32" sub sea pipeline.




  • Photos