Pire co
Pire co
Pire co
  • ASALUYEH Sea Water Intake (Mobin)

     Client: Mobin Petrochemical
     Location: Pars Free Zone, Mobin Petrochemical
     Project Start Date: October 2004
     Scope of Work: Detail Design & Procurement Services
     Brief Description:
    This system consists of a flare package on LEE breakwater, flare tip facilities & relevant pipe connections. Flare’s 16 inch pipeline is located at the far end of a 215 meter bridge (150 meters under the sea). Total weight of bridge, flare & and bridge supports are about 500 tones and the total length of pipelines (1” & 16” sizes) is around 2000 meters.




  • Photos